Current time: 10:48:49AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 1 will be detoured.
Route 1 to Bowness will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 1-Bowness/Forest Lawn at 1 ST SE on WB 6 AV going ←Bowness
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 11 - 16 Mins at 11:00:23AM. 0:29 ahead of 11:04:00AM Vehicle 8210 Load 102%?
2: 38 - 46 Mins at 11:27:47AM. Waiting 6:04. 1:21 behind 11:29:00AM Vehicle 8300 Load 107%? ↩
3: 1h03 - 1h11 Mins at 11:52:45AM. 1:55 behind 11:54:00AM Vehicle 8147 Load 102%? ↩
4: 1h28 - 1h36 Mins at 12:17:31PM. 1:15 behind 12:19:00PM Vehicle 8258 Load 97%? ↩
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.