Current time: 8:56:12AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 1 will be detoured.
Route 1 to Bowness will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 1-Bowness/Forest Lawn at 23 ST NW on WB Kensington RD going ←Bowness
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 8:56:12AM. Waiting 55:31. 2:03 ahead of 8:25:00AM Vehicle 8210 Load 116%? Last seen 55:16
2: 5 - 11 Mins at 9:01:31AM. Waiting 1:13:09. 14:59 behind 8:50:00AM Vehicle 8300 Load 168%? ↩ Last seen 55:09
3: 15 - 20 Mins at 9:11:27AM. Waiting 55:05. 0:57 ahead of 9:15:00AM Vehicle 8147 Load 36%? ↩ Last seen 55:05
4: 44 - 49 Mins at 9:40:46AM. Waiting 58:17. 0:25 ahead of 9:43:00AM Vehicle 8258 Load 114%? ↩ Last seen 55:17
5: 1h09 - 1h14 Mins at 10:06:04AM. Waiting 55:05. 0:18 ahead of 10:08:00AM Vehicle 8112 Load 100%? ↩ Last seen 55:05
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.