Current time: 8:27:13AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 1 will be detoured.
Route 1 to Bowness will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 1-Bowness/Forest Lawn at 64 ST NW on WB Bowness RD going ←Bowness
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 8:27:13AM. Waiting 26:06. 0:47 ahead of 8:16:00AM Vehicle 8231 Load 104%? Last seen 26:06
2: 12 - 16 Mins at 8:39:41AM. Waiting 26:32. 0:37 ahead of 8:41:00AM Vehicle 8210 Load 116%? Last seen 26:17
3: 47 - 1h03 Mins at 9:14:23AM. Waiting 44:10. 15:37 behind 9:06:00AM Vehicle 8300 Load 165%? ↩ Last seen 26:10
4: 1h02 - 1h07 Mins at 9:29:59AM. Waiting 26:06. 0:01 behind 9:31:00AM Vehicle 8147 Load 38%? ↩ Last seen 26:06
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.