Current time: 9:02:01AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 1 will be detoured.
Route 1 to Bowness will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 1-Bowness/Forest Lawn at Point DR NW NLeg on EB Bowness RD going →Forest Lawn
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 9:02:01AM. Waiting 1:00:54. 0:35 ahead of 8:04:00AM Vehicle 8112 Load 98%? Last seen 1:00:54
2: 0:00 Mins at 9:02:01AM. Waiting 1:08:57. 0:07 behind 8:29:00AM Vehicle 8229 Load 103%? ↩ Last seen 1:00:58
3: 0:00 Mins at 9:02:01AM. Waiting 1:00:54. 1:18 behind 8:54:00AM Vehicle 8231 Load 105%? ↩ Last seen 1:00:54
4: 15 - 19 Mins at 9:18:00AM. Waiting 1:01:20. 0:06 behind 9:19:00AM Vehicle 8210 Load 95%? ↩ Last seen 1:01:05
5: 50 - 1h02 Mins at 9:52:01AM. Waiting 1:18:58. 16:36 behind 9:44:00AM Vehicle 8300 Load 166%? ↩ Last seen 1:00:58
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.