Current time: 9:00:03AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 1 will be detoured.
Route 1 to Bowness will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 1-Bowness/Forest Lawn at 17 AV SE on NB 52 ST SE going →Forest Lawn
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: At Stop Waiting 58:56. 1:53 ahead of 8:03:00AM Vehicle 8147 Load 96%? Last seen 58:56
2: 0:00 Mins at 9:00:03AM. Waiting 1:02:08. 1:53 ahead of 8:29:00AM Vehicle 8258 Load 116%? Last seen 59:08
3: 0:00 Mins at 9:00:03AM. Waiting 58:56. 2:25 ahead of 8:54:00AM Vehicle 8112 Load 97%? Last seen 58:56
4: 16 - 23 Mins at 9:16:56AM. Waiting 1:06:59. 2:56 ahead of 9:22:00AM Vehicle 8229 Load 98%? ↩ Last seen 59:00
5: 42 - 50 Mins at 9:42:55AM. Waiting 58:56. 2:56 ahead of 9:48:00AM Vehicle 8231 Load 93%? ↩ Last seen 58:56
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.