Current time: 8:59:17AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 1 will be detoured.
Route 1 to Bowness will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 1-Bowness/Forest Lawn at 5 ST SW on EB 5 AV SW going →Forest Lawn
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 8:59:17AM. Waiting 58:10. 2:28 ahead of 8:21:00AM Vehicle 8112 Load 98%? Last seen 58:10
2: 0:00 Mins at 8:59:17AM. Waiting 1:06:13. 1:20 ahead of 8:46:00AM Vehicle 8229 Load 102%? ↩ Last seen 58:14
3: 9 - 15 Mins at 9:08:36AM. Waiting 58:10. 1:23 ahead of 9:12:00AM Vehicle 8231 Load 102%? ↩ Last seen 58:10
4: 35 - 39 Mins at 9:34:54AM. Waiting 58:36. 1:34 ahead of 9:37:00AM Vehicle 8210 Load 97%? ↩ Last seen 58:21
5: 1h08 - 1h20 Mins at 10:08:03AM. Waiting 1:16:14. 13:11 behind 10:02:00AM Vehicle 8300 Load 156%? ↩ Last seen 58:14
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.