Current time: 8:26:59AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 1 will be detoured.
Route 1 to Bowness will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 1-Bowness/Forest Lawn at 11 ST SE on WB 9 AV SE going ←Bowness
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 8:26:59AM. Waiting 26:18. 5:11 behind 8:00:00AM Vehicle 8210 Load 119%? Last seen 26:03
2: 0:00 - 1:32 Mins at 8:26:59AM. Waiting 43:56. 1:38 behind 8:25:00AM Vehicle 8300 Load 86%? ↩ Last seen 25:56
3: 20 - 27 Mins at 8:47:09AM. Waiting 25:52. 0:45 behind 8:50:00AM Vehicle 8147 Load 96%? ↩ Last seen 25:52
4: 46 - 53 Mins at 9:13:19AM. Waiting 29:04. 0:58 behind 9:16:00AM Vehicle 8258 Load 105%? ↩ Last seen 26:04
5: 1h09 - 1h16 Mins at 9:36:44AM. Waiting 25:52. 1:17 ahead of 9:41:00AM Vehicle 8112 Load 91%? ↩ Last seen 25:52
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.