Current time: 9:31:36AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 1 will be detoured.
Route 1 to Bowness will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 1-Bowness/Forest Lawn at 14 ST SE on WB 9 AV SE going ←Bowness
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 1:31 - 3 Mins at 9:33:06AM. 4:57 ahead of 9:39:00AM Vehicle 8112 Load 291%?
2: 28 - 31 Mins at 10:00:07AM. Waiting 9:19. 2:12 ahead of 10:04:00AM Vehicle 8229 Load 107%? ↩
3: 54 - 1h01 Mins at 10:25:45AM. 0:02 behind 10:29:00AM Vehicle 8231 Load 105%? ↩
4: 1h19 - 1h28 Mins at 10:51:17AM. 1:39 behind 10:54:00AM Vehicle 8210 Load 102%? ↩
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.