Current time: 9:55:15AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 1 will be detoured.
Route 1 to Bowness will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 1-Bowness/Forest Lawn at 15 ST SE on WB 9 AV SE going ←Bowness
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 6 - 9 Mins at 10:01:40AM. 0:10 ahead of 10:03:00AM Vehicle 8229 Load 112%?
2: 29 - 38 Mins at 10:24:33AM. 0:13 behind 10:28:00AM Vehicle 8231 Load 101%? ↩
3: 54 - 1h00 Mins at 10:49:35AM. 0:23 ahead of 10:53:00AM Vehicle 8210 Load 98%? ↩
4: 1h21 - 1h28 Mins at 11:16:48AM. 2:26 behind 11:18:00AM Vehicle 8300 Load 111%? ↩
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.