Current time: 8:50:33AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 1 will be detoured.
Route 1 to Bowness will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 1-Bowness/Forest Lawn at Point DR NW SLeg on EB Bowness RD going →Forest Lawn
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 8:50:33AM. Waiting 49:26. 1:07 ahead of 8:05:00AM Vehicle 8112 Load 98%? Last seen 49:26
2: 0:00 Mins at 8:50:33AM. Waiting 57:29. 0:22 ahead of 8:30:00AM Vehicle 8229 Load 103%? ↩ Last seen 49:30
3: 3 - 6 Mins at 8:53:35AM. Waiting 49:26. 0:17 ahead of 8:55:00AM Vehicle 8231 Load 100%? ↩ Last seen 49:26
4: 28 - 31 Mins at 9:18:45AM. Waiting 49:52. 0:13 ahead of 9:20:00AM Vehicle 8210 Load 100%? ↩ Last seen 49:37
5: 1h02 - 1h14 Mins at 9:52:38AM. Waiting 1:07:30. 16:03 behind 9:45:00AM Vehicle 8300 Load 165%? ↩ Last seen 49:30
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.