Current time: 11:26:06AM Refresh
Starting Thursday, May 9 from 7 a.m. through Friday, July 5 at 7 p.m., there will be a road closure at 1 Avenue S.W. between 101 Street S.W. and 109 Street S.W. for utility work. Route 108 will be detoured.
Before 12 p.m. (noon), westbound route 108 will travel:
Before 12 p.m. (noon), eastbound route 108 will travel:
After 12 p.m. (noon), westbound route 108 will travel:
After 12 p.m. (noon), eastbound route 108 will travel:
No stops will be impacted.
Remove ads by becoming a Premium User
• : 108-Paskapoo Slopes at Valley Ridge DR NW on EB Valley Pointe GR going →Brentwood
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 4 - 9 Mins at 11:30:27AM. 1:10 behind 11:31:00AM Vehicle 8225 Load 106%? ↩
2: 26 - 30 Mins at 11:52:53AM. 1:36 behind 11:53:00AM Vehicle 8247 Load 102%? ↩
3: 48 - 50 Mins at 12:14:30PM. Waiting 10:26. 0:08 behind 12:15:00PM Vehicle 8322 Load 93%? ↩ Last seen 1:11
4: 1h09 - 1h11 Mins at 12:35:31PM. 0:06 behind 12:36:00PM Vehicle 7767 Load 95%? ↩
Starting Tuesday, May 21 through Thursday, May 30 from 9 a.m. to 3 p.m. daily on weekdays only, the westbound right lane on 32 Avenue N.W. @ 37 Street N.W. will be closed for construction. Routes 8 and 108 will have stop closures.
The following stop will be temporarily closed:
Please use the following stops in lieu of the closed stop:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.