Current time: 7:53:30AM Refresh
Starting Monday, April 29 through Friday, May 24 from 9 a.m. to 3 p.m. daily, Country Village Way N.E. @ Harvest Hills Boulevard N. will be closed for construction. Routes 86 and 114 will be detoured.
Route 86 will travel:
Route 114 will travel:
The following stops will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 114-Panorama/Country Hills at N. of Beddington BV on NB Centre ST N going Panorama/Country Hills
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 26 - 30 Mins at 8:20:02AM. 1:24 behind 8:20:00AM Vehicle 1246 Load 102%? ↩
2: 1h06 - 1h08 Mins at 9:00:02AM. 0:55 behind 9:00:00AM Vehicle 1341 Load 99%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.