Current time: 9:04:20AM Refresh
Starting Monday, April 29 through Friday, May 24 from 9 a.m. to 3 p.m. daily, Country Village Way N.E. @ Harvest Hills Boulevard N. will be closed for construction. Routes 86 and 114 will be detoured.
Route 86 will travel:
Route 114 will travel:
The following stops will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 114-Panorama/Country Hills at Panamount GD NW on SB Panorama Hills DR NW going Panorama/Country Hills
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 9:04:20AM. Waiting 1:09:45. 1:33 behind 8:44:00AM Vehicle 1341 Load 205%? ↩ Last seen 1:03:15
2: 59 - 1h05 Mins at 10:04:18AM. Waiting 1:09:45. 1:44 behind 10:04:00AM Vehicle 1341 Load 200%? ↩ Last seen 1:03:15
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.