Current time: 4:58:51PM Refresh
Remove ads by becoming a Premium User
• : 131-East Bow Express at McKenzie Meadows DR SE on SB McKenzie Lake BV going ↓Auburn Bay Express
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 3 - 5 Mins at 5:02:42PM. 1:16 behind 5:02:00PM Vehicle 7812
2: 23 - 34 Mins at 5:22:44PM. 5:14 behind 5:22:00PM Vehicle 7976 Load 109%? Last seen 2:19
3: 42 - 55 Mins at 5:40:56PM. 2:37 behind 5:42:00PM Vehicle 7862 Load 96%?
Starting Monday, May 27 at 5 a.m. through Sunday, June 9 at 7 p.m., there will be lane closures 5 Avenue S.W. between 2 Street & 3 Street S.W. for Green Line utility construction work. Routes 62, 64, 109, 116, 117, 131, 142 and 151 will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Monday, April 22 at 7 a.m. through Friday, June 14 at 7 p.m., the northbound right-hand lane on Ogden Road S.E. @ 78 Avenue S.E. will be closed for construction and 2-way traffic will be set up on the southbound lane. Routes 43, 117, 131, 151, 302 and 779 will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.