Current time: Refresh

Agencies » Calgary Transit

Remove ads by becoming a Premium User

 • : 23-52 St E at Front ST SE on NB Seton WY going 52 St E

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 5 - 7 Mins
at . 0:47 behind Vehicle 6044 Load 152%? Last seen 1:05

2: 17 - 20 Mins
at . Waiting 5:21. 2:05 behind Vehicle 6042 Load 82%? Last seen 1:06

3: 24 - 28 Mins
at . Waiting 11:10. 58:47 behind Vehicle 8514 Load 58%? Last seen 1:10

4: 28 - 30 Mins
at . 0:45 behind Vehicle 6084 Load 13%? Last seen 1:05

5: 40 Mins
at . 0:00 behind Vehicle 6068 Load 75%? Last seen 1:04


Starting Wednesday, May 22 through Saturday, June 1, the northbound right lane of Falconridge Boulevard N.E. at 64 Avenue N.E. will be closed for construction. Routes 23, 68, 754, and 798 will have stop closures.


Daily weekday closures will occur between 9 a.m. and 3 p.m..


Daily weekend closures will occur between 7 a.m. and 3 p.m..


The following stops will be temporarily closed:



  • NB Falconridge BV @ 64 AV NE (#6668) - Route 23, 68, 754

  • NB Falconridge BV @ 64 AV NE (#9460) - Route 68


Please use the following stops in lieu of the closed stops:



  • NB Falconridge BV @ 64 AV NE, 50m north of closed stop*


* Please note this stop is not universally accessible.

Started May 22 Until Jun 1

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.