Current time: 6:07:02PM Refresh
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at Sandstone Terminal on NB going ↑Centre St N
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 4 - 15 Mins at 6:11:56PM. 10:20 behind 6:03:00PM Vehicle 6067 Load 126%?
2: 9 - 19 Mins at 6:17:00PM. 4:29 behind 6:14:00PM Vehicle 6079 Load 64%?
3: 23 - 32 Mins at 6:30:32PM. 9:13 behind 6:24:00PM Vehicle 6043 Load 128%?
4: 34 - 52 Mins at 6:41:59PM. 9:26 behind 6:38:00PM Vehicle 6002 Load 101%?
5: 57 - 1h14 Mins at 7:04:55PM. 8:26 behind 7:01:00PM Vehicle 7902 Load 191%? ↩
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.