Current time: 1:31:33PM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 3 and 17 will be detoured.
Southbound routes 3 and 17 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Sunday, May 19 at 6 a.m. through Tuesday, May 21 at 8 p.m., Heritage Terminal will be partially closed for water service repairs. Route 3 will be detoured.
Buses will travel:
Stop #3756 at Heritage Station will be temporarily closed. Please use the temporary stop located just west of the closed stop.
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at 5 ST SW on EB Heritage DR going ↓Elbow Drive
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 3 - 4 Mins at 1:34:45PM. 13:31 behind 1:22:00PM Vehicle 8344 Load 126%?
2: 22 - 27 Mins at 1:54:28PM. 14:19 behind 1:42:00PM Vehicle 8068 Load 118%? Last seen 1:28
3: 31 - 40 Mins at 2:02:46PM. 3:56 behind 2:02:00PM Vehicle 8135 Load 81%?
4: 1h11 - 1h15 Mins at 2:43:02PM. 2:46 behind 2:42:00PM Vehicle 8114 Load 194%? ↩
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.