Current time: 11:20:37AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 3 and 17 will be detoured.
Southbound routes 3 and 17 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at 47 AV SW on NB Elbow DR going ↑Centre St N
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 11:20:37AM. 1:24 behind 11:19:00AM Vehicle 8344 Load 103%?
2: 20 - 37 Mins at 11:41:37AM. 12:05 behind 11:39:00AM Vehicle 8068 Load 153%? ↩
3: 38 - 41 Mins at 11:58:38AM. 1:14 behind 11:59:00AM Vehicle 8135 Load 46%? ↩ Last seen 1:05
4: 1h16 - 1h24 Mins at 12:37:14PM. 1:54 behind 12:40:00PM Vehicle 8114 Load 208%? ↩ Last seen 1:00
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.