Current time: 3:08:34PM Refresh
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at Bermuda DR NW on NB Beddington BV
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 2 - 3 Mins at 3:10:54PM. 3:22 behind 3:08:00PM Vehicle 6055 Load 174%? ↑Centre St N
2: 4 - 7 Mins at 3:13:01PM. 0:36 ahead of 3:15:00PM Vehicle 7984 Load 53%? ↑Centre St N
3: 12 - 18 Mins at 3:20:57PM. 0:30 behind 3:23:00PM Vehicle 6067 Load 83%? ↑Centre St N
4: 18 - 21 Mins at 3:26:45PM. 0:29 ahead of 3:28:00PM Vehicle 6074 Load 75%? ↑Sandstone
5: 26 - 36 Mins at 3:35:30PM. 7:25 behind 3:32:00PM Vehicle 7794 Load 120%? ↑Centre St N
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.