Current time: 8:49:13PM Refresh
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at 38 AV SW on NB Elbow DR going ↑Centre St N
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 24 - 29 Mins at 9:13:45PM. 4:53 behind 9:12:00PM Vehicle 8398 Load 239%? ↩
2: 41 - 45 Mins at 9:30:39PM. 4:54 behind 9:27:00PM Vehicle 7841 Load 100%? ↩
3: 51 - 57 Mins at 9:41:02PM. 1:07 behind 9:42:00PM Vehicle 8311 Load 75%? ↩
4: 1h13 - 1h20 Mins at 10:03:02PM. 1:06 behind 10:04:00PM Vehicle 7984 Load 147%? ↩
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.