Current time: 6:04:23PM Refresh
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at 36 AV SW on SB Elbow DR going ↓Elbow Drive
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 9 - 18 Mins at 6:14:01PM. 31:46 behind 5:45:00PM Vehicle 6045 Load 309%?
2: 15 - 24 Mins at 6:20:05PM. 26:09 behind 5:58:00PM Vehicle 8498 Load 50%?
3: 27 - 32 Mins at 6:32:08PM. 2:23 behind 6:32:00PM Vehicle 8224 Load 159%?
4: 32 - 44 Mins at 6:36:37PM. 20:58 behind 6:21:00PM Vehicle 6008 Load 57%?
5: 33 - 42 Mins at 6:38:07PM. 1:33 ahead of 6:43:00PM Vehicle 6055 Load 11%?
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.