Current time: Refresh

Agencies » Calgary Transit

Remove ads by becoming a Premium User

 • : 3-Sandstone/Elbow Dr SW at 36 AV SW on SB Elbow DR going Elbow Drive

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 9 - 18 Mins
at . 31:46 behind Vehicle 6045 Load 309%?

2: 15 - 24 Mins
at . 26:09 behind Vehicle 8498 Load 50%?

3: 27 - 32 Mins
at . 2:23 behind Vehicle 8224 Load 159%?

4: 32 - 44 Mins
at . 20:58 behind Vehicle 6008 Load 57%?

5: 33 - 42 Mins
at . 1:33 ahead of Vehicle 6055 Load 11%?


Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.


The following stop will be temporarily closed:



  • NB Centre ST N. @ 38 AV N. (#6660)


Please use the following stops in lieu of the closed stops:



  • NB Centre ST N. @ 36 AV N. (#6659)

  • NB Centre ST N. @ 40 AV N. (#6661)

Started May 17 Until Jun 21

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.