Current time: 1:32:41PM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 3 and 17 will be detoured.
Southbound routes 3 and 17 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Sunday, May 19 at 6 a.m. through Tuesday, May 21 at 8 p.m., Heritage Terminal will be partially closed for water service repairs. Route 3 will be detoured.
Buses will travel:
Stop #3756 at Heritage Station will be temporarily closed. Please use the temporary stop located just west of the closed stop.
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at Crescent BV SW on SB Elbow DR going ↓Elbow Drive
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 11 - 16 Mins at 1:44:37PM. 14:07 behind 1:33:00PM Vehicle 8068 Load 118%?
2: 21 - 32 Mins at 1:53:42PM. 4:08 behind 1:53:00PM Vehicle 8135 Load 81%?
3: 1h00 - 1h08 Mins at 2:33:10PM. 2:38 behind 2:33:00PM Vehicle 8114 Load 192%? ↩
4: 1h20 - 1h32 Mins at 2:53:32PM. 2:26 behind 2:53:00PM Vehicle 8076 Load 99%? ↩
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.