Current time: 11:23:43AM Refresh
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at 22 AV N on NB Centre ST N going ↑Centre St N
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 10 - 16 Mins at 11:34:16AM. 3:23 behind 11:33:00AM Vehicle 6008 Load 116%?
2: 26 - 35 Mins at 11:50:01AM. 5:55 behind 11:48:00AM Vehicle 8311 Load 104%?
3: 38 - 44 Mins at 12:02:26PM. 1:30 behind 12:03:00PM Vehicle 6055 Load 87%?
4: 54 - 59 Mins at 12:18:02PM. 1:46 behind 12:18:00PM Vehicle 6067 Load 102%? ↩
5: 1h09 - 1h16 Mins at 12:33:34PM. 2:53 behind 12:33:00PM Vehicle 6079 Load 108%? ↩
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Tuesday, May 28 at 9 a.m. through Wednesday, May 29 at 3 p.m., stop #7308 located on southbound 4 Street between 23 - 24 Avenue S.W. will be closed to accomodate utility work.
Please use the temporary stop located on southbound 4 Street @ 24 Avenue S.W. (nearside).
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.