Current time: 11:54:52AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 3 and 17 will be detoured.
Southbound routes 3 and 17 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Sunday, May 19 at 6 a.m. through Tuesday, May 21 at 8 p.m., Heritage Terminal will be partially closed for water service repairs. Route 3 will be detoured.
Buses will travel:
Stop #3756 at Heritage Station will be temporarily closed. Please use the temporary stop located just west of the closed stop.
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at 25 AV N on NB Centre ST N going ↑Centre St N
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 11:54:52AM. 5:15 behind 11:49:00AM Vehicle 8344 Load 106%?
2: 14 - 18 Mins at 12:09:12PM. 1:31 behind 12:09:00PM Vehicle 8068 Load 99%?
3: 35 - 41 Mins at 12:30:13PM. 2:17 behind 12:30:00PM Vehicle 8135 Load 96%?
4: 1h16 - 1h26 Mins at 1:11:30PM. 3:58 behind 1:11:00PM Vehicle 8114 Load 213%? ↩
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.