Current time: 12:17:03PM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 3 and 17 will be detoured.
Southbound routes 3 and 17 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Sunday, May 19 at 6 a.m. through Tuesday, May 21 at 8 p.m., Heritage Terminal will be partially closed for water service repairs. Route 3 will be detoured.
Buses will travel:
Stop #3756 at Heritage Station will be temporarily closed. Please use the temporary stop located just west of the closed stop.
Remove ads by becoming a Premium User
• : 3-Sandstone/Elbow Dr SW at 56 AV N on NB Centre ST N going ↑Centre St N
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 12:17:03PM. 0:55 ahead of 12:18:00PM Vehicle 8068 Load 93%?
2: 18 - 24 Mins at 12:35:24PM. 1:34 ahead of 12:39:00PM Vehicle 8135 Load 91%?
3: 1h02 - 1h14 Mins at 1:19:57PM. 3:56 behind 1:20:00PM Vehicle 8114 Load 221%? ↩
4: 1h22 - 1h30 Mins at 1:39:21PM. 1:44 behind 1:40:00PM Vehicle 8076 Load 85%? ↩
Starting Friday, May 17 through Friday, June 21 from 9 a.m. to 3 p.m. daily, there will be a northbound right lane closure at Centre Street N. @ 38 Avenue N.E. for sidewalk rehabilitation. Route 3 will have a stop closure.
The following stop will be temporarily closed:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.