Current time: 7:07:16AM Refresh
Remove ads by becoming a Premium User
• : 300-BRT Airport/City Centre at 2 ST SW on WB 4 AV SW going ↓City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 7:07:16AM. 1:06 ahead of 7:07:00AM Vehicle 8303 Load 101%?
2: 26 - 30 Mins at 7:34:10AM. 1:07 ahead of 7:37:00AM Vehicle 8305 Load 88%? Last seen 1:09
3: 58 - 1h02 Mins at 8:06:12AM. 0:28 behind 8:07:00AM Vehicle 8307 Load 105%? ↩ Last seen 1:08
4: 1h28 - 1h33 Mins at 8:35:19AM. 0:04 ahead of 8:37:00AM Vehicle 8303 Load 98%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.