Current time: 12:12:26PM Refresh
Remove ads by becoming a Premium User
• : 300-BRT Airport/City Centre at Centre ST S on EB 9 AV S going ↑Brt Airport
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 8 - 14 Mins at 12:20:51PM. 3:26 behind 12:19:00PM Vehicle 8305 Load 76%? ↩
2: 29 - 38 Mins at 12:42:23PM. 3:43 behind 12:42:00PM Vehicle 8304 Load 99%? ↩
3: 59 - 1h06 Mins at 1:11:49PM. 8:57 behind 1:05:00PM Vehicle 8301 Load 120%? ↩
4: 1h20 - 1h30 Mins at 1:33:11PM. 9:27 behind 1:28:00PM Vehicle 8302 Load 100%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.