Current time: 4:58:19PM Refresh
Remove ads by becoming a Premium User
• : 300-BRT Airport/City Centre at 40 AV N on NB Centre ST N going ↑Brt Airport
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:20 Mins at 4:58:39PM. 9:55 behind 4:49:00PM Vehicle 8301 Load 135%?
2: 15 - 24 Mins at 5:13:26PM. 3:56 behind 5:14:00PM Vehicle 8302 Load 79%? Last seen 1:10
3: 34 - 50 Mins at 5:32:33PM. 0:57 behind 5:39:00PM Vehicle 8305 Load 86%? ↩
4: 1h01 - 1h13 Mins at 6:00:08PM. 0:45 behind 6:01:00PM Vehicle 8304 Load 85%? ↩
5: 1h25 - 1h36 Mins at 6:24:03PM. 0:40 behind 6:25:00PM Vehicle 8301 Load 94%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.