Current time: 12:13:16PM Refresh
Remove ads by becoming a Premium User
• : 300-BRT Airport/City Centre at 40 AV N on SB Centre ST N going ↓City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 9 - 15 Mins at 12:22:36PM. 2:23 behind 12:23:00PM Vehicle 8304 Load 97%?
2: 30 - 40 Mins at 12:44:05PM. 2:43 behind 12:46:00PM Vehicle 8301 Load 101%? ↩
3: 56 - 1h01 Mins at 1:09:29PM. 3:45 behind 1:09:00PM Vehicle 8302 Load 105%? ↩
4: 1h18 - 1h23 Mins at 1:31:42PM. 0:58 behind 1:32:00PM Vehicle 8305 Load 88%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.