Current time: 6:44:27PM Refresh
Remove ads by becoming a Premium User
• : 300-BRT Airport/City Centre at Northmount DR N on SB Centre ST N going ↓City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 7 - 9 Mins at 6:52:17PM. 2:45 behind 6:50:00PM Vehicle 8304 Load 134%?
2: 33 - 39 Mins at 7:18:14PM. 8:32 behind 7:13:00PM Vehicle 8301 Load 131%? ↩
3: 47 - 55 Mins at 7:31:44PM. 1:12 behind 7:34:00PM Vehicle 8302 Load 62%? ↩
4: 1h10 - 1h15 Mins at 7:54:43PM. Waiting 7:31. 0:52 behind 7:56:00PM Vehicle 8305 Load 99%? ↩ Last seen 3:46
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.