Current time: 6:07:53PM Refresh
Remove ads by becoming a Premium User
• : 300-BRT Airport/City Centre at 78 AV N on SB Centre ST N going ↓City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 17 - 22 Mins at 6:24:56PM. Waiting 6:28. 3:06 behind 6:24:00PM Vehicle 8305 Load 86%? ↩ Last seen 6:28
2: 38 - 45 Mins at 6:46:08PM. 2:25 behind 6:46:00PM Vehicle 8304 Load 88%? ↩
3: 1h09 - 1h18 Mins at 7:17:08PM. 13:47 behind 7:09:00PM Vehicle 8301 Load 142%? ↩
4: 1h20 - 1h29 Mins at 7:28:33PM. 0:53 behind 7:30:00PM Vehicle 8302 Load 33%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.