Current time: 9:03:24AM Refresh
Remove ads by becoming a Premium User
• : 300-BRT Airport/City Centre at Harvest Rose PA on EB 96 AV NE going ↑Brt Airport
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 9:03:24AM. Waiting 1:02:18. 0:44 behind 8:16:00AM Vehicle 8305 Load 102%? Last seen 1:02:18
2: 0:00 Mins at 9:03:24AM. Waiting 1:02:17. 2:45 behind 8:46:00AM Vehicle 8307 Load 107%? ↩ Last seen 1:02:17
3: 12 - 15 Mins at 9:16:14AM. Waiting 1:07:19. 1:20 behind 9:16:00AM Vehicle 8303 Load 95%? ↩ Last seen 1:02:20
4: 41 - 44 Mins at 9:45:05AM. Waiting 1:02:18. 0:20 behind 9:46:00AM Vehicle 8305 Load 97%? ↩ Last seen 1:02:18
5: 1h11 - 1h15 Mins at 10:15:06AM. Waiting 1:02:17. 1:39 behind 10:15:00AM Vehicle 8307 Load 101%? ↩ Last seen 1:02:17
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.