Current time: 2:27:24PM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 301 will be detoured.
Route 301 will travel:
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stop:
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at 7 AVE SW on SB 7 ST SW going ↓City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 2 - 8 Mins at 2:29:29PM. 3:43 behind 2:27:00PM Vehicle 8468 Load 98%? Last seen 1:09
2: 15 - 23 Mins at 2:42:48PM. 2:38 behind 2:43:00PM Vehicle 8181 Load 82%? Last seen 1:05
3: 47 - 57 Mins at 3:15:03PM. 19:54 behind 2:59:00PM Vehicle 8165 Load 208%? ↩
4: 54 - 59 Mins at 3:21:32PM. 7:44 behind 3:15:00PM Vehicle 8457 Load 24%? ↩ Last seen 1:10
5: 1h06 - 1h15 Mins at 3:34:00PM. 6:34 behind 3:31:00PM Vehicle 8430 Load 93%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.