Current time: 10:56:57AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 301 will be detoured.
Route 301 will travel:
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stop:
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at 1 ST SW mid-block on EB 5 AV SW going ↑301 North
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 7 - 13 Mins at 11:04:43AM. 1:19 behind 11:06:00AM Vehicle 8165 Load 109%? ↩
2: 23 - 26 Mins at 11:20:20AM. 0:08 ahead of 11:22:00AM Vehicle 8457 Load 91%? ↩
3: 42 - 46 Mins at 11:39:31AM. 5:01 behind 11:38:00AM Vehicle 8430 Load 132%? ↩ Last seen 1:27
4: 56 - 58 Mins at 11:53:44AM. 0:37 behind 11:54:00AM Vehicle 8468 Load 73%? ↩
5: 1h16 - 1h20 Mins at 12:13:48PM. 0:19 behind 12:14:00PM Vehicle 8181 Load 123%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.