Current time: 3:09:58PM Refresh
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at 28 AV N on NB Centre ST N going ↑301 North
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 9 - 12 Mins at 3:19:21PM. 0:37 behind 3:20:00PM Vehicle 6066 Load 134%?
2: 14 - 18 Mins at 3:24:08PM. 1:51 behind 3:25:00PM Vehicle 6092 Load 49%?
3: 18 - 25 Mins at 3:28:36PM. 0:19 behind 3:30:00PM Vehicle 6053 Load 31%? ↩
4: 36 Mins at 3:46:29PM. 1:29 behind 3:45:00PM Vehicle 8415 Load 147%? ↩
5: 40 Mins at 3:50:00PM. 0:00 behind 3:50:00PM Vehicle 7830 Load 32%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.