Current time: 1:31:06PM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 301 will be detoured.
Route 301 will travel:
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stop:
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at N. of Beddington BV on NB Centre ST N going ↑301 North
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 12 - 13 Mins at 1:43:17PM. 6:40 behind 1:37:00PM Vehicle 8468 Load 143%?
2: 21 - 24 Mins at 1:52:49PM. 0:49 behind 1:53:00PM Vehicle 8181 Load 74%?
3: 43 - 51 Mins at 2:14:26PM. 8:29 behind 2:09:00PM Vehicle 8165 Load 148%? ↩
4: 56 - 1h01 Mins at 2:27:11PM. 4:25 behind 2:25:00PM Vehicle 8457 Load 74%? ↩
5: 1h12 - 1h21 Mins at 2:43:57PM. 6:34 behind 2:41:00PM Vehicle 8430 Load 113%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.