Current time: 10:17:51AM Refresh
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at 56 AV N on NB Centre ST N going ↑301 North
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 6 - 9 Mins at 10:24:30AM. 0:26 ahead of 10:26:00AM Vehicle 8399 Load 100%?
2: 18 - 23 Mins at 10:36:25AM. 0:18 behind 10:38:00AM Vehicle 8372 Load 94%?
3: 32 - 37 Mins at 10:50:51AM. 2:39 behind 10:50:00AM Vehicle 6001 Load 120%? ↩
4: 43 - 49 Mins at 11:01:11AM. 1:56 behind 11:02:00AM Vehicle 6066 Load 94%? ↩
5: 55 - 59 Mins at 11:13:25AM. 1:04 behind 11:14:00AM Vehicle 6053 Load 93%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.