Current time: 3:10:17PM Refresh
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at 4 AV S on NB Centre ST S going ↑301 North
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:53 - 3 Mins at 3:11:10PM. 3:02 behind 3:09:00PM Vehicle 6066 Load 137%?
2: 4 - 9 Mins at 3:15:13PM. 2:24 behind 3:14:00PM Vehicle 6092 Load 42%? Last seen 1:00
3: 9 - 16 Mins at 3:20:06PM. 3:20 behind 3:19:00PM Vehicle 6053 Load 59%? ↩
4: 27 - 32 Mins at 3:37:53PM. 5:47 behind 3:34:00PM Vehicle 8415 Load 174%? ↩
5: 28 Mins at 3:39:00PM. 0:00 behind 3:39:00PM Vehicle 7830 Load -8%? ↩ Last seen 1:00
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.