Current time: 12:14:05PM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 301 will be detoured.
Route 301 will travel:
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stop:
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at 5 ST SW on WB 6 AV SW going ↓City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 7 - 8 Mins at 12:21:31PM. 4:07 behind 12:18:00PM Vehicle 8165 Load 91%?
2: 22 - 28 Mins at 12:36:55PM. 4:53 behind 12:34:00PM Vehicle 8457 Load 107%?
3: 42 - 53 Mins at 12:56:56PM. 12:02 behind 12:50:00PM Vehicle 8430 Load 145%? ↩
4: 54 - 59 Mins at 1:08:12PM. 4:07 behind 1:06:00PM Vehicle 8468 Load 50%? ↩
5: 1h09 - 1h17 Mins at 1:24:01PM. 5:34 behind 1:22:00PM Vehicle 8181 Load 109%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.