Current time: 11:53:05AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 301 will be detoured.
Route 301 will travel:
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stop:
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at Northmount DR N on SB Centre ST N going ↓City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 5 - 7 Mins at 11:58:39AM. 0:12 ahead of 12:00:00PM Vehicle 8165 Load 88%?
2: 19 - 25 Mins at 12:13:05PM. 0:29 behind 12:16:00PM Vehicle 8457 Load 93%? ↩
3: 45 - 52 Mins at 12:38:11PM. 10:34 behind 12:32:00PM Vehicle 8430 Load 145%? ↩
4: 55 - 59 Mins at 12:48:27PM. 1:30 behind 12:48:00PM Vehicle 8468 Load 38%? ↩
5: 1h11 - 1h16 Mins at 1:04:23PM. 1:33 behind 1:04:00PM Vehicle 8181 Load 89%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.