Current time: 3:08:58PM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 301 will be detoured.
Route 301 will travel:
The following stop will be temporarily closed:
Please use the following stop in lieu of the closed stop:
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at 64 AV N on SB Centre ST N going ↓City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 9 - 12 Mins at 3:18:26PM. 8:33 behind 3:11:00PM Vehicle 8430 Load 121%?
2: 13 - 21 Mins at 3:22:44PM. 1:22 ahead of 3:27:00PM Vehicle 8468 Load 38%? ↩
3: 34 - 41 Mins at 3:43:28PM. 3:01 behind 3:43:00PM Vehicle 8181 Load 127%? ↩
4: 1h05 - 1h12 Mins at 4:14:45PM. 17:55 behind 3:59:00PM Vehicle 8165 Load 193%? ↩ Last seen 1:01
5: 1h08 - 1h11 Mins at 4:17:43PM. 3:48 behind 4:15:00PM Vehicle 8457 Load 12%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Starting Wednesday, May 1 through Friday, May 24 at 7 a.m., there will be left lane closures at 6 Avenue S.W. between 2 Street and 4 Street S.W. for Green Line construction work. Routes 1, 3, 6, 17, 22, 66, 101, 301, 302 & MAX Yellow will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.