Current time: 8:43:21PM Refresh
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at 78 AV N on SB Centre ST N going ↓City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 10 - 17 Mins at 8:54:18PM. 1:06 behind 8:55:00PM Vehicle 8381 Load 113%? ↩
2: 31 - 37 Mins at 9:14:58PM. 2:53 behind 9:15:00PM Vehicle 8358 Load 109%? ↩
3: 51 - 56 Mins at 9:34:38PM. 1:27 behind 9:35:00PM Vehicle 8372 Load 93%? ↩
4: 1h10 - 1h11 Mins at 9:53:25PM. 0:36 ahead of 9:55:00PM Vehicle 8517 Load 90%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.