Current time: 8:45:25PM Refresh
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at N. of Beddington BV N on SB Centre ST N going ↓City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 7 - 13 Mins at 8:52:55PM. Waiting 6:13. 1:01 behind 8:54:00PM Vehicle 8381 Load 116%? ↩
2: 28 - 33 Mins at 9:13:43PM. 2:05 behind 9:14:00PM Vehicle 8358 Load 105%? ↩
3: 48 - 53 Mins at 9:33:30PM. 1:09 behind 9:34:00PM Vehicle 8372 Load 95%? ↩
4: 1h07 - 1h13 Mins at 9:52:43PM. 0:30 behind 9:54:00PM Vehicle 8517 Load 97%? ↩
5: 1h26 - 1h32 Mins at 10:11:45PM. Waiting 6:13. 0:39 behind 10:13:00PM Vehicle 8381 Load 96%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.