Current time: 1:50:04PM Refresh
Remove ads by becoming a Premium User
• : 301-BRT North/City Centre at North Pointe Terminal A going ↑301 North
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 1:50:04PM. Waiting 5:08. 8:15 behind 1:42:00PM Vehicle 8372 Load 120%?
2: 7 - 13 Mins at 1:57:31PM. 4:24 behind 1:54:00PM Vehicle 6001 Load 117%?
3: 14 - 26 Mins at 2:04:47PM. 1:03 ahead of 2:08:00PM Vehicle 6066 Load 77%?
4: 28 - 38 Mins at 2:18:52PM. 0:12 ahead of 2:22:00PM Vehicle 6053 Load 119%? Last seen 1:27
5: 55 - 1h09 Mins at 2:45:53PM. 0:47 behind 2:49:00PM Vehicle 8358 Load 221%? ↩
Starting Monday, April 29 at 9 a.m. through Friday, June 28 at 3 p.m., Centre Street N. @ Beddington Boulevard N.W. will have a closure for North Central BRT construction. Routes 2, 88, 114, 300, 301, 736, 738 and 739 will have stop closures.
The following stops at SB Centre ST N. @ N. of Beddington BV N. will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.