Current time: 7:15:35AM Refresh
Remove ads by becoming a Premium User
• : 302-BRT Southeast/City Centre at Main Ent. South Health Campus SE on WB Front ST going ↓South Health Campus
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 6 - 17 Mins at 7:22:02AM. 1:12 behind 7:23:00AM Vehicle 6014 Load 94%?
2: 28 - 37 Mins at 7:44:09AM. 1:39 behind 7:45:00AM Vehicle 7968 Load 105%? Last seen 1:29
3: 40 - 54 Mins at 7:55:35AM. 2:25 behind 7:57:00AM Vehicle 7867 Load 81%? Last seen 1:03
4: 55 - 1h02 Mins at 8:11:11AM. 2:46 behind 8:10:00AM Vehicle 6043 Load 54%?
5: 1h05 - 1h18 Mins at 8:21:04AM. 1:46 behind 8:22:00AM Vehicle 7864 Load 49%? ↩
Starting Monday, April 22 at 7 a.m. through Friday, June 14 at 7 p.m., the northbound right-hand lane on Ogden Road S.E. @ 78 Avenue S.E. will be closed for construction and 2-way traffic will be set up on the southbound lane. Routes 43, 117, 131, 151, 302 and 779 will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.