Current time: 7:17:38AM Refresh
Remove ads by becoming a Premium User
• : 302-BRT Southeast/City Centre at 107 AV SE on NB 24 ST going ↑City Centre
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:36 - 1:46 Mins at 7:18:14AM. 3:37 behind 7:15:00AM Vehicle 8013 Load 113%?
2: 12 - 15 Mins at 7:30:27AM. 5:08 behind 7:27:00AM Vehicle 7881 Load 110%?
3: 22 - 27 Mins at 7:39:58AM. 2:22 behind 7:39:00AM Vehicle 7835 Load 175%? Last seen 1:02
4: 42 - 48 Mins at 8:00:22AM. Waiting 5:26. 2:39 behind 7:59:00AM Vehicle 6014 Load 169%? ↩
5: 1h02 - 1h09 Mins at 8:20:37AM. 3:48 behind 8:19:00AM Vehicle 7968 Load 176%? ↩ Last seen 3:32
Starting Monday, April 22 at 7 a.m. through Friday, June 14 at 7 p.m., the northbound right-hand lane on Ogden Road S.E. @ 78 Avenue S.E. will be closed for construction and 2-way traffic will be set up on the southbound lane. Routes 43, 117, 131, 151, 302 and 779 will have stop closures.
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.