Current time: 6:28:25AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Routes 101 and 302 will be detoured.
Routes 101 and 302 will travel:
The following stops will be temporarily closed:
Please use the following stop in lieu of the closed stops:
Starting Friday, May 17 at 9 a.m. through Tuesday, May 21 at 5 p.m., Ogden Road S.E. will be closed both ways between 74 Avenue & 76 Avenue S.E. for Utility Work. Routes 117, 131, 151, and 302 will be detoured.
Southbound routes will travel:
Northbound routes will travel:
No stops are affected.
Remove ads by becoming a Premium User
• : 302-BRT Southeast/City Centre at 50 AV SE on SB Ogden RD going ↓South Health Campus
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 5 - 7 Mins at 6:33:29AM. 0:21 ahead of 6:35:00AM Vehicle 8125 Load 96%? Last seen 3:42
2: 31 - 33 Mins at 6:59:38AM. Waiting 5:45. 0:23 ahead of 7:01:00AM Vehicle 8040 Load 104%? ↩
3: 57 - 59 Mins at 7:25:36AM. 0:35 ahead of 7:27:00AM Vehicle 8032 Load 103%? ↩
4: 1h23 - 1h25 Mins at 7:51:40AM. Waiting 9:56. 0:42 ahead of 7:53:00AM Vehicle 8080 Load 104%? ↩
Starting Monday, April 22 at 7 a.m. through Friday, June 14 at 7 p.m., the northbound right-hand lane on Ogden Road S.E. @ 78 Avenue S.E. will be closed for construction and 2-way traffic will be set up on the southbound lane. Routes 43, 117, 131, 151, 302 and 779 will have stop closures.
Please use the following stops in lieu of the closed stops:
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.