Current time: 7:41:34AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 4 will be detoured.
Route 4 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Thursday, May 16 through Friday, June 14, access into the Route 4 stop at 78 Avenue Terminal (Centre Street North at 78 Avenue N.E.) will be restricted due to traffic signals work. Route 4 will be detoured.
Daily weekday closures will occur between 9 a.m. and 3 p.m..
Remove ads by becoming a Premium User
• : 4-Huntington at Northmount DR NW on NB Cambrian DR going Huntington
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 23 - 27 Mins at 8:05:03AM. 0:41 behind 8:06:00AM Vehicle 8209 Load 104%?
2: 48 - 51 Mins at 8:30:04AM. Waiting 11:03. 0:31 behind 8:31:00AM Vehicle 8225 Load 103%? ↩
3: 1h12 - 1h18 Mins at 8:54:17AM. 1:04 behind 8:55:00AM Vehicle 8036 Load 102%? ↩
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.