Current time: 7:21:59AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 4 will be detoured.
Route 4 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Thursday, May 16 through Friday, June 14, access into the Route 4 stop at 78 Avenue Terminal (Centre Street North at 78 Avenue N.E.) will be restricted due to traffic signals work. Route 4 will be detoured.
Daily weekday closures will occur between 9 a.m. and 3 p.m..
Remove ads by becoming a Premium User
• : 4-Huntington at 37 AV NE on SB Edmonton TR going Huntington
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 6 - 9 Mins at 7:28:19AM. 0:03 ahead of 7:30:00AM Vehicle 8209 Load 96%?
2: 31 - 37 Mins at 7:53:35AM. 1:44 behind 7:55:00AM Vehicle 8225 Load 112%? ↩
3: 55 - 1h01 Mins at 8:17:34AM. 1:26 behind 8:19:00AM Vehicle 8036 Load 99%? ↩
4: 1h19 - 2h18 Mins at 8:41:19AM. 2:01 behind 8:43:00AM Vehicle 8209 Load 102%? ↩
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.