Current time: 8:19:24AM Refresh
Starting Friday, May 17 at 8 p.m. through Tuesday, May 21 at 5 a.m., there will be a full closure at 6 Avenue S.W. between 2 Street S.W. and 4 Street S.W. for Green Line construction. Route 4 will be detoured.
Route 4 will travel:
The following stops will be temporarily closed:
Please use the following stops in lieu of the closed stops:
Starting Thursday, May 16 through Friday, June 14, access into the Route 4 stop at 78 Avenue Terminal (Centre Street North at 78 Avenue N.E.) will be restricted due to traffic signals work. Route 4 will be detoured.
Daily weekday closures will occur between 9 a.m. and 3 p.m..
Remove ads by becoming a Premium User
• : 4-Huntington at Cambrian DR on NB 14 ST NW going Huntington
Prev Stop | Next Stop | Near Stops | Schedule | Set Destination
1: 0:00 Mins at 8:19:24AM. Waiting 18:44. 1:23 ahead of 8:07:00AM Vehicle 8209 Load 103%? Last seen 18:29
2: 14 - 21 Mins at 8:34:01AM. Waiting 18:24. 4:48 behind 8:32:00AM Vehicle 8225 Load 127%? Last seen 18:24
3: 35 - 40 Mins at 8:55:22AM. Waiting 26:21. 0:39 behind 8:56:00AM Vehicle 8036 Load 79%? ↩ Last seen 18:21
4: 59 - 1h05 Mins at 9:19:20AM. Waiting 18:44. 0:35 behind 9:20:00AM Vehicle 8209 Load 96%? ↩ Last seen 18:29
5: 1h28 - 1h35 Mins at 9:47:45AM. Waiting 18:24. 7:05 behind 9:44:00AM Vehicle 8225 Load 122%? ↩ Last seen 18:24
Add stop (different agency)
Settings (enable more features)
Stops near me by GPS going North East South West
Search place or address:
TransSee by Darwin O'Connor. Follow on Twitter.